Manufacturing Facilities  
 
     
 
MULK Holdings is currently establishing manufacturing facilities in U.A.E and India to produce all components of Mulk Enpar Renewable Energy Parabolic Troughs . The initial capacity per annum will be for a 200 MW capacity up gradable to 500 MW.

The First manufacturing base will be spread over 400,000 sq/ft of land with a covered factory space of 150,000 sq/ft and located in Sharjah Hamriya Free zone. Phase One which is expected to be completed before May 2009, will include two productions lines of Alubond Solar Collector Mirror (ASCM) with an annual capacity of 2,000,000 m2, and a 30 meters per minute High Speed Coating Line for protective coating of ASCM.

The plant will also have a Full fledged metal casting and fabrication facility for manufacturing and supply of Mulk Enpar Renewable Energy Parabolic Trough substructure and accessories.
 
     
  Production Facilities  
     
 
 
BELGRADE, EUROPE FREEZONE, AJMAN, UAE
 
     
 
 
SHARJAH HAMRIYA, UAE SHARJAH HAMRIYA, UAE
 
     
 
 
ALUBOND DACS, INDIA

ALUBOND MIDDLE EAST, AJMAN, U.A.E

 
     
  Fabrication Facilities   Surface Protection Coating  
     
 
 
ALUBOND MIDDLE EAST, AJMAN, U.A.E ALUBOND CCL - SHARJAH, UAE